Contact Us
Get In Touch
For more information on the SPG, please contact:
Tony Butcher
Secretary for the Steel Piling Group
C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot, Berkshire, SL5 7QN.
Email: secretary@steelpilinggroup.org
SCI Contact
Nancy Baddoo, Associate Director
Tel: +44 (0)1344 636 547
Email: info@steelpilinggroup.org
![Sheet Piling with Press-in Methods adjacent to a live Railway](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/IMG_5261-510x382.jpg)
![Wood Wharf, London (Canary Wharf)](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/WW-1-510x382.jpg)
![Port of Dundee East Redevelopment](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/PoD-1.jpg)
![Dual Purpose Sheet Pile Retaining Wall](https://www.steelpilinggroup.org/wp-content/uploads/2023/02/HC1e-1-510x382.jpg)
![Permanent Riverbank Flood Defence Sheet Pile Works](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/DJI_0108-510x382.jpg)
![Permanent Sheet Pile Basement](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/4b82405f-454e-4ed9-ae44-f2804fd826a8-2-1-510x382.jpg)
![Maritime – Reservoir Sheet Pile Cut Off Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/M_2017_Island-Barn-Case-Study-510x382.png)
![Rail Case Study – Canary Wharf Crossrail Station](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/R_2015_crossrail-510x382.png)
![Highway Case Study – Highley Alveley Bridge](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/H_2006_highley_alveley_bridge-1-510x382.png)
![THAMES TIDEWAY TUNNEL](https://www.steelpilinggroup.org/wp-content/uploads/2018/09/feature-thames-tideway-tunnel-510x382.png)
![Specialist Case Study – Flood Defence Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/00_auto_1400x580_enderby_14-510x382.jpg)
![Building Case Study – Basement Car Park](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/IMG_1103-510x382.jpg)
![Building Case Study – Inner City Basement](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/item-large2-510x382.jpg)
![SUSTAINABILTY CASE STUDY – THERMAL STEEL SHEET PILES](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/thermal-pile-015b-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC02522-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01889-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/15k-Sub-sea-7-036-510x382.jpg)
![HIGHWAY CASE STUDY – SERVICE ROAD RETAINING WALL](https://www.steelpilinggroup.org/wp-content/uploads/2017/10/SPG-CaseStudy-Basingstoke-Fussey-1-510x382.jpg)
![MARITIME CASE STUDY – COMBINATION WALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/6500-on-1420-tube-01-510x382.jpg)
![MARITIME CASE STUDY – NEW DEEP WATER QUAY](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/A-V-Dawson-077-510x382.jpg)
![RAIL CASE STUDY – EDINBURGH TRAM NETWORK](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_5503-510x382.jpg)
![RAIL CASE STUDY – LONDON UNDERGROUND UPGRADE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/London-Underground-Chapel-Street-510x382.jpg)
![SPECIALIST CASE STUDY – FLOOD DEFENCE SUPPORT](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/4D-Eastney-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Subsea7-02-cropped-510x382.jpg)
![HIGHWAY CASE STUDY – SLIP ROAD IMPROVEMENTS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC00956b-510x382.jpg)
![HIGHWAY CASE STUDY – MS3 & MS4 GANTRY FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/mSL271008b-510x382.jpg)
![SPECIALIST CASE STUDY – CONCRETE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_0798-cropped-510x382.jpg)
![BUILDING CASE STUDY – PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/SANY0111b-510x382.jpg)
![BUILDING CASE STUDY – BASEMENT EXTENSION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_1218b-510x382.jpg)
![RAIL CASE STUDY – WHITE HORSE BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DCP_0809-510x382.jpg)
![SPECIALIST CASE STUDY – OFFSHORE PIPELINE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01999-510x382.jpg)
![BUILDING CASE STUDY – NEW BASEMENT](https://www.steelpilinggroup.org/wp-content/uploads/2017/12/hornsey-street-london-510x382.jpg)
![BUILDING CASE STUDY – AUTOMATED DISTRIBUTION CENTRE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/1-optimised.jpg)
![HIGHWAY CASE STUDY – WHADDON ROAD BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/PICTURE10-510x382.jpg)
![MARITIME CASE STUDY – RETAINING RIVERWALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Pontoon-Work-1b-510x382.jpg)
![MARITIME CASE STUDY – THAMES PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01734-510x382.jpg)
![HIGHWAYS CASE STUDY – BOX PILE BRIDGE FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2017/11/Box-Pile-Stratford-510x382.jpg)
Steel Piling Group, C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot ,Berkshire. SL5 7QN
E: info@steelpilinggroup.org
© Copyright 2018 Steel Piling Group
Terms & Conditions | Privacy Policy