News
Company & Industry
![Open Meeting – Sustainability, decarbonisation & future thinking of steel piling industry](https://www.steelpilinggroup.org/wp-content/uploads/2018/07/SPG-Seminar.png)
Open Meeting – Sustainability, decarbonisation & future thinking of steel piling industry
The latest Steel Piling Group Open Meeting is on Thursday 23rd November 2023 at The Studio Birmingham just 3 minutes walk to New Street Station. The overall theme for this meeting is sustainability for the steel piling industry, presentations include : JCB Road to...
![New Steel Piling Specifiers’ Guide](https://www.steelpilinggroup.org/wp-content/uploads/2023/06/P308v2-1.jpg)
New Steel Piling Specifiers’ Guide
After much work by Nancy Baddoo and the team at the SCI the brand new and fully revised "Specifiers’ Guide to Steel Piling, Second Edition (P308)" is now available for download from the SPG website. This new publication provides a comprehensive overview of the use of...
![Steel Piling Day – Open Meeting](https://www.steelpilinggroup.org/wp-content/uploads/2018/07/sciday2018-1-e1665387089189.png)
Steel Piling Day – Open Meeting
The latest Steel Piling Group Open Meeting has been arranged for Tuesday 1st November 2022. This year’s event will run alongside the SCI Steel Day at the Institution of Mechanical Engineers, One Birdcage Walk, London, SW1H 9JJ The event will run from 09:55 to 15:30...
![Webinar](https://www.steelpilinggroup.org/wp-content/uploads/2022/06/webinar.png)
Webinar
The Steel Piling Group will be holding a webinar where guests and members will present on a wide range of steel piling related topics. Guests can register for the events here Date: Tuesday 14th June 2022, 12:30 to 14:30 Topics & speakers include : Piling in...
Webinar
The Steel Piling Group will be holding a webinar where Guests and Members will present on a wide range of Steel Piling related topics. Guests can register for the events by emailing secretary@steelpilinggroup.org Date: Tuesday 23rd November, 12:00 noon Topics include...
![Exhibition](https://www.steelpilinggroup.org/wp-content/uploads/2021/09/base2021-1.png)
Exhibition
The Steel Piling Group will be manning a stand at the 14th Ground Engineering Basements and Underground Structures event on Wednesday 6th October 2021 at the Park Plaza Hotel Riverbank, London. Come along and see us on Stand N and find out how the Steel Piling Group...
Webinar
The Steel Piling Group will be holding a webinar where Guests and Members will present on a wide range of Steel Piling related topics. Guests can register for the events by emailing secretary@steelpilinggroup.org Date: Wednesday 26th May, 12:30pm Topics include :...
Webinars
This year the Steel Piling Day will be replaced by two Webinars where Guests and Members will present on a wide range of Steel Piling related topics. Guests can register for the events by emailing secretary@steelpilinggroup.org Date: Wednesday 18th November, 12:30pm...
Open Meeting March 26th 2020 – Bristol **postponed**
Update 19/3/20 - Due to the current COVID-19 situation this meeting has been postponed until further notice. . Arup Bristol Office, 63 St. Thomas Street, Bristol, BS1 6JZ We are very happy to be visiting Bristol for the first time for a regional...
![Steel Piling Day – Open Meeting](https://www.steelpilinggroup.org/wp-content/uploads/2018/07/sciday2018-1-e1665387089189.png)
Event November 7th 2019
Venue - Institution of Mechanical Engineers, Westminster, London, SW1H 9JJ This year our main theme is ‘Innovative steel piling solutions’ and mirrors the theme of the parallel UK Steel Construction Day. The seminars will explore how steel solutions can be used to...
Case Studies
A selection of our work
![Sheet Piling with Press-in Methods adjacent to a live Railway](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/IMG_5261-510x382.jpg)
![Wood Wharf, London (Canary Wharf)](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/WW-1-510x382.jpg)
![Port of Dundee East Redevelopment](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/PoD-1.jpg)
![Dual Purpose Sheet Pile Retaining Wall](https://www.steelpilinggroup.org/wp-content/uploads/2023/02/HC1e-1-510x382.jpg)
![Permanent Riverbank Flood Defence Sheet Pile Works](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/DJI_0108-510x382.jpg)
![Permanent Sheet Pile Basement](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/4b82405f-454e-4ed9-ae44-f2804fd826a8-2-1-510x382.jpg)
![Maritime – Reservoir Sheet Pile Cut Off Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/M_2017_Island-Barn-Case-Study-510x382.png)
![Rail Case Study – Canary Wharf Crossrail Station](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/R_2015_crossrail-510x382.png)
![Highway Case Study – Highley Alveley Bridge](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/H_2006_highley_alveley_bridge-1-510x382.png)
![THAMES TIDEWAY TUNNEL](https://www.steelpilinggroup.org/wp-content/uploads/2018/09/feature-thames-tideway-tunnel-510x382.png)
![Specialist Case Study – Flood Defence Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/00_auto_1400x580_enderby_14-510x382.jpg)
![Building Case Study – Basement Car Park](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/IMG_1103-510x382.jpg)
![Building Case Study – Inner City Basement](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/item-large2-510x382.jpg)
![SUSTAINABILTY CASE STUDY – THERMAL STEEL SHEET PILES](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/thermal-pile-015b-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC02522-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01889-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/15k-Sub-sea-7-036-510x382.jpg)
![HIGHWAY CASE STUDY – SERVICE ROAD RETAINING WALL](https://www.steelpilinggroup.org/wp-content/uploads/2017/10/SPG-CaseStudy-Basingstoke-Fussey-1-510x382.jpg)
![MARITIME CASE STUDY – COMBINATION WALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/6500-on-1420-tube-01-510x382.jpg)
![MARITIME CASE STUDY – NEW DEEP WATER QUAY](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/A-V-Dawson-077-510x382.jpg)
![RAIL CASE STUDY – EDINBURGH TRAM NETWORK](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_5503-510x382.jpg)
![RAIL CASE STUDY – LONDON UNDERGROUND UPGRADE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/London-Underground-Chapel-Street-510x382.jpg)
![SPECIALIST CASE STUDY – FLOOD DEFENCE SUPPORT](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/4D-Eastney-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Subsea7-02-cropped-510x382.jpg)
![HIGHWAY CASE STUDY – SLIP ROAD IMPROVEMENTS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC00956b-510x382.jpg)
![HIGHWAY CASE STUDY – MS3 & MS4 GANTRY FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/mSL271008b-510x382.jpg)
![SPECIALIST CASE STUDY – CONCRETE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_0798-cropped-510x382.jpg)
![BUILDING CASE STUDY – PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/SANY0111b-510x382.jpg)
![BUILDING CASE STUDY – BASEMENT EXTENSION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_1218b-510x382.jpg)
![RAIL CASE STUDY – WHITE HORSE BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DCP_0809-510x382.jpg)
![SPECIALIST CASE STUDY – OFFSHORE PIPELINE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01999-510x382.jpg)
![BUILDING CASE STUDY – NEW BASEMENT](https://www.steelpilinggroup.org/wp-content/uploads/2017/12/hornsey-street-london-510x382.jpg)
![BUILDING CASE STUDY – AUTOMATED DISTRIBUTION CENTRE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/1-optimised.jpg)
![HIGHWAY CASE STUDY – WHADDON ROAD BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/PICTURE10-510x382.jpg)
![MARITIME CASE STUDY – RETAINING RIVERWALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Pontoon-Work-1b-510x382.jpg)
![MARITIME CASE STUDY – THAMES PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01734-510x382.jpg)
![HIGHWAYS CASE STUDY – BOX PILE BRIDGE FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2017/11/Box-Pile-Stratford-510x382.jpg)
Steel Piling Group, C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot ,Berkshire. SL5 7QN
E: info@steelpilinggroup.org
© Copyright 2018 Steel Piling Group
Terms & Conditions | Privacy Policy