[featured_image]
  • Version
  • Download 656
  • File Size 387.92 KB
  • File Count 1
  • Create Date 11th January 2023
  • Last Updated 11th January 2023

GN06 - Working Platform Requirements for Tracked Excavator Piling Rigs

This guidance note describes the need for suitable engineered surfaces for operating piling rigs safely.

Failure to provide adequate working platforms could result in dangerous instability and overturning of the piling rig with the potential for a catastrophic accident to occur.

Attached Files

1 file
pdf
SPG - Guidance Note GN-06 Working Platform Requirements for Tracked Excavator Piling Rigs.pdf
387.92 KB2023-01-11

Steel Piling Group, C/O SCI, Unit 2, The E Centre, Bracknell, RG12 1NF, UK
E: info@steelpilinggroup.org

SCI Logo

© Copyright 2025 Steel Piling Group
Terms & Conditions | Privacy Policy