Maritime – Reservoir Sheet Pile Cut Off Wall

Maritime – Reservoir Sheet Pile Cut Off Wall

Maritime – Reservoir Sheet Pile Cut Off Wall Island Barn Reservoir, London (2017) << Back to ‘Maritime’ case studies Sheet Piling (UK) Ltd have recently completed an innovative and technically challenging project at Island Barn Reservoir in...
Rail Case Study – Canary Wharf Crossrail Station

Rail Case Study – Canary Wharf Crossrail Station

Rail Case Study – Canary Wharf Crossrail Station Tubular cofferdam (2015) << Back to ‘Rail’ case studies Completed in 2015, the Canary Wharf Crossrail Station in East London was the first Elizabeth Line station built. The piles and concrete...
Highway Case Study – Highley Alveley Bridge

Highway Case Study – Highley Alveley Bridge

Highway Case Study – Highley Alveley Bridge Driven Steel H-Pile Foundations (2006) << Back to ‘Highway’ case studies The Highley and Alveley footbridge is a replacement bridge crossing over the River Severn between Highley and Alveley in...
THAMES TIDEWAY TUNNEL

THAMES TIDEWAY TUNNEL

THAMES TIDEWAY TUNNEL CARNWARTH ROAD RIVERSIDE, FULHAM << Back to ‘Maritime’ case studies Dawson Construction Plant Ltd supplied the BAM Nuttall-Morgan Sindall-Balfour Beatty joint venture in 2017, with a 4 cylinder Push Pull system for silent and...
Specialist Case Study – Flood Defence Wall

Specialist Case Study – Flood Defence Wall

Specialist Case Study – Flood Defence Wall  Enderby Wharf, Greenwich, London << Back to ‘Specialist Work’ case studies Client: UKD Groundworks Contractor: Fussey Piling Limited Location: Enderby Wharf, Greenwich, London Scope: 200m long wall along the...
Building Case Study – Basement Car Park

Building Case Study – Basement Car Park

Building Case Study – Basement Car Park  Wembley, London << Back to ‘Building’ case studies Client: John Sisk and Sons Contractor: Fussey Piling Limited Location: Wembley, London Scope: Permanent sheet piled retaining wall with heights up to...