1st November 2018
Maritime – Reservoir Sheet Pile Cut Off Wall Island Barn Reservoir, London (2017) << Back to ‘Maritime’ case studies Sheet Piling (UK) Ltd have recently completed an innovative and technically challenging project at Island Barn Reservoir in...
1st November 2018
Rail Case Study – Canary Wharf Crossrail Station Tubular cofferdam (2015) << Back to ‘Rail’ case studies Completed in 2015, the Canary Wharf Crossrail Station in East London was the first Elizabeth Line station built. The piles and concrete...
1st November 2018
Highway Case Study – Highley Alveley Bridge Driven Steel H-Pile Foundations (2006) << Back to ‘Highway’ case studies The Highley and Alveley footbridge is a replacement bridge crossing over the River Severn between Highley and Alveley in...
18th September 2018
THAMES TIDEWAY TUNNEL CARNWARTH ROAD RIVERSIDE, FULHAM << Back to ‘Maritime’ case studies Dawson Construction Plant Ltd supplied the BAM Nuttall-Morgan Sindall-Balfour Beatty joint venture in 2017, with a 4 cylinder Push Pull system for silent and...
6th March 2018
Specialist Case Study – Flood Defence Wall Enderby Wharf, Greenwich, London << Back to ‘Specialist Work’ case studies Client: UKD Groundworks Contractor: Fussey Piling Limited Location: Enderby Wharf, Greenwich, London Scope: 200m long wall along the...
6th March 2018
Building Case Study – Basement Car Park Wembley, London << Back to ‘Building’ case studies Client: John Sisk and Sons Contractor: Fussey Piling Limited Location: Wembley, London Scope: Permanent sheet piled retaining wall with heights up to...