GN01 – What Information Do I Need to Install Steel Piles? | Guidance for typical project information required before selection of a steel piled solution, including - ground investigation, site constraints , access, design features & construction tolerances. | Guidance for typical project information required before selection of a steel piled solution, including – ground investigation, site constraints , access, design features & construction tolerances. | Guidance Note | 3rd January 2023 | Download |
GN02 – Should I be concerned about noise during the installation of steel piles? | Steel piling does not have to be loud! A steel pile solution should never be ruled out on the basis of noise as options exist to mitigate this to an acceptable level - this guidance note gives details of modern installation methods including, impact, vibratory & hydraulic press-in driving | Steel piling does not have to be loud! A steel pile solution should never be ruled out on the basis of noise as options exist to mitigate this to an acceptable level – this guidance note gives details of modern installation methods including, impact, vibratory & hydraulic press-in driving | Guidance Note | 3rd January 2023 | Download |
GN03 – When should I choose Steel Piles? | Steel piles can offer flexible, safe and quick to install solutions for bearing and retaining problems - designers select steel piles to overcome
many specific design challenges. This guidance note gives some of the reaons why steel piles should be considered over other solutions. | Steel piles can offer flexible, safe and quick to install solutions for bearing and retaining problems – designers select steel piles to overcome many specific design challenges. This guidance note gives some of the reaons why steel piles should be considered over other solutions. | Guidance Note | 3rd January 2023 | Download |
GN04 – How long do steel piles last? | Steel will naturally corrode over time, the deterioration rate will depend on the local envrionment and steel grade selected. This guidance notes details factors that affect this and measures that can be employed to achieve design lives in excess of 125 years. | Steel will naturally corrode over time, the deterioration rate will depend on the local envrionment and steel grade selected. This guidance notes details factors that affect this and measures that can be employed to achieve design lives in excess of 125 years. | Guidance Note | 3rd January 2023 | Download |
GN05 – Are Steel Sheet Piles Impermeable? | The answer to this question is a qualified YES! This guidance notes describes various methods to reduce or even completely stop water flow through the interlocks. | The answer to this question is a qualified YES! This guidance notes describes various methods to reduce or even completely stop water flow through the interlocks. | Guidance Note | 3rd January 2023 | Download |
GN06 – Working Platform Requirements for Tracked Excavator Piling Rigs | This guidance note describes the need for suitable engineered surfaces for operating piling rigs safely. Failure to provide adequate working platforms could result in dangerous instability and overturning of the piling rig with the potential for a catastrophic accident to occur. | This guidance note describes the need for suitable engineered surfaces for operating piling rigs safely. Failure to provide adequate working platforms could result in dangerous instability and overturning of the piling rig with the potential for a catastrophic accident to occur. | Guidance Note | 11th January 2023 | Download |
Disclaimer
Although care has been taken to ensure, to the best of our knowledge, that all data and information contained herein are accurate to the extent that they relate to either matters of fact or accepted practice or matters of opinion at the time of publication, SPG, SCI, the authors and the reviewers assume no responsibility for any errors in or misinterpretations of such data and/or information or any loss or damage arising from or related to their use.
Case Studies
A selection of our work
![Sheet Piling with Press-in Methods adjacent to a live Railway](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/IMG_5261-510x382.jpg)
![Wood Wharf, London (Canary Wharf)](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/WW-1-510x382.jpg)
![Port of Dundee East Redevelopment](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/PoD-1.jpg)
![Dual Purpose Sheet Pile Retaining Wall](https://www.steelpilinggroup.org/wp-content/uploads/2023/02/HC1e-1-510x382.jpg)
![Permanent Riverbank Flood Defence Sheet Pile Works](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/DJI_0108-510x382.jpg)
![Permanent Sheet Pile Basement](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/4b82405f-454e-4ed9-ae44-f2804fd826a8-2-1-510x382.jpg)
![Maritime – Reservoir Sheet Pile Cut Off Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/M_2017_Island-Barn-Case-Study-510x382.png)
![Rail Case Study – Canary Wharf Crossrail Station](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/R_2015_crossrail-510x382.png)
![Highway Case Study – Highley Alveley Bridge](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/H_2006_highley_alveley_bridge-1-510x382.png)
![THAMES TIDEWAY TUNNEL](https://www.steelpilinggroup.org/wp-content/uploads/2018/09/feature-thames-tideway-tunnel-510x382.png)
![Specialist Case Study – Flood Defence Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/00_auto_1400x580_enderby_14-510x382.jpg)
![Building Case Study – Basement Car Park](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/IMG_1103-510x382.jpg)
![Building Case Study – Inner City Basement](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/item-large2-510x382.jpg)
![SUSTAINABILTY CASE STUDY – THERMAL STEEL SHEET PILES](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/thermal-pile-015b-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC02522-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01889-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/15k-Sub-sea-7-036-510x382.jpg)
![HIGHWAY CASE STUDY – SERVICE ROAD RETAINING WALL](https://www.steelpilinggroup.org/wp-content/uploads/2017/10/SPG-CaseStudy-Basingstoke-Fussey-1-510x382.jpg)
![MARITIME CASE STUDY – COMBINATION WALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/6500-on-1420-tube-01-510x382.jpg)
![MARITIME CASE STUDY – NEW DEEP WATER QUAY](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/A-V-Dawson-077-510x382.jpg)
![RAIL CASE STUDY – EDINBURGH TRAM NETWORK](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_5503-510x382.jpg)
![RAIL CASE STUDY – LONDON UNDERGROUND UPGRADE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/London-Underground-Chapel-Street-510x382.jpg)
![SPECIALIST CASE STUDY – FLOOD DEFENCE SUPPORT](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/4D-Eastney-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Subsea7-02-cropped-510x382.jpg)
![HIGHWAY CASE STUDY – SLIP ROAD IMPROVEMENTS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC00956b-510x382.jpg)
![HIGHWAY CASE STUDY – MS3 & MS4 GANTRY FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/mSL271008b-510x382.jpg)
![SPECIALIST CASE STUDY – CONCRETE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_0798-cropped-510x382.jpg)
![BUILDING CASE STUDY – PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/SANY0111b-510x382.jpg)
![BUILDING CASE STUDY – BASEMENT EXTENSION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_1218b-510x382.jpg)
![RAIL CASE STUDY – WHITE HORSE BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DCP_0809-510x382.jpg)
![SPECIALIST CASE STUDY – OFFSHORE PIPELINE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01999-510x382.jpg)
![BUILDING CASE STUDY – NEW BASEMENT](https://www.steelpilinggroup.org/wp-content/uploads/2017/12/hornsey-street-london-510x382.jpg)
![BUILDING CASE STUDY – AUTOMATED DISTRIBUTION CENTRE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/1-optimised.jpg)
![HIGHWAY CASE STUDY – WHADDON ROAD BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/PICTURE10-510x382.jpg)
![MARITIME CASE STUDY – RETAINING RIVERWALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Pontoon-Work-1b-510x382.jpg)
![MARITIME CASE STUDY – THAMES PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01734-510x382.jpg)
![HIGHWAYS CASE STUDY – BOX PILE BRIDGE FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2017/11/Box-Pile-Stratford-510x382.jpg)
Steel Piling Group, C/O SCI, Silwood Park, Unit D, Buckhurst Road, Ascot ,Berkshire. SL5 7QN
E: info@steelpilinggroup.org
© Copyright 2018 Steel Piling Group
Terms & Conditions | Privacy Policy