Title | |||||
---|---|---|---|---|---|
Publication SCI_P422 Durability of Steel Piling | This updated guide outlines the corrosion performance of piles in various environments and reviews the protective measures that can be taken to increase the life of steel piles. The guide is referenced by ICE SPERW and complements EN1993-5 presenting a worked design example to illustrate the approach | This updated guide outlines the corrosion performance of piles in various environments and reviews the protective measures that can be taken to increase the life of steel piles. The guide is referenced by ICE SPERW and complements EN1993-5 presenting a worked design example to illustrate the approach to designing for durability. | Publication | 29th May 2019 | Download |
Specifiers’ Guide to Steel Piling, Second Edition (P308) | This new publication provides a comprehensive overview of the use of steel piling in the UK. It provides information on the specification, design and installation of steel piling products, covering both sheet piles and bearing piles. Sustainability, durability, impermeable sheet wall construction and | This new publication provides a comprehensive overview of the use of steel piling in the UK. It provides information on the specification, design and installation of steel piling products, covering both sheet piles and bearing piles. Sustainability, durability, impermeable sheet wall construction and fire safety are also covered. | Publication | 14th June 2023 | Download |
Disclaimer
Although care has been taken to ensure, to the best of our knowledge, that all data and information contained herein are accurate to the extent that they relate to either matters of fact or accepted practice or matters of opinion at the time of publication, SPG, SCI, the authors and the reviewers assume no responsibility for any errors in or misinterpretations of such data and/or information or any loss or damage arising from or related to their use.
Case Studies
A selection of our work
![Sheet Piling with Press-in Methods adjacent to a live Railway](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/IMG_5261-510x382.jpg)
![Wood Wharf, London (Canary Wharf)](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/WW-1-510x382.jpg)
![Port of Dundee East Redevelopment](https://www.steelpilinggroup.org/wp-content/uploads/2023/05/PoD-1.jpg)
![Dual Purpose Sheet Pile Retaining Wall](https://www.steelpilinggroup.org/wp-content/uploads/2023/02/HC1e-1-510x382.jpg)
![Permanent Riverbank Flood Defence Sheet Pile Works](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/DJI_0108-510x382.jpg)
![Permanent Sheet Pile Basement](https://www.steelpilinggroup.org/wp-content/uploads/2023/01/4b82405f-454e-4ed9-ae44-f2804fd826a8-2-1-510x382.jpg)
![Maritime – Reservoir Sheet Pile Cut Off Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/M_2017_Island-Barn-Case-Study-510x382.png)
![Rail Case Study – Canary Wharf Crossrail Station](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/R_2015_crossrail-510x382.png)
![Highway Case Study – Highley Alveley Bridge](https://www.steelpilinggroup.org/wp-content/uploads/2018/11/H_2006_highley_alveley_bridge-1-510x382.png)
![THAMES TIDEWAY TUNNEL](https://www.steelpilinggroup.org/wp-content/uploads/2018/09/feature-thames-tideway-tunnel-510x382.png)
![Specialist Case Study – Flood Defence Wall](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/00_auto_1400x580_enderby_14-510x382.jpg)
![Building Case Study – Basement Car Park](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/IMG_1103-510x382.jpg)
![Building Case Study – Inner City Basement](https://www.steelpilinggroup.org/wp-content/uploads/2018/03/item-large2-510x382.jpg)
![SUSTAINABILTY CASE STUDY – THERMAL STEEL SHEET PILES](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/thermal-pile-015b-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC02522-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01889-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/15k-Sub-sea-7-036-510x382.jpg)
![HIGHWAY CASE STUDY – SERVICE ROAD RETAINING WALL](https://www.steelpilinggroup.org/wp-content/uploads/2017/10/SPG-CaseStudy-Basingstoke-Fussey-1-510x382.jpg)
![MARITIME CASE STUDY – COMBINATION WALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/6500-on-1420-tube-01-510x382.jpg)
![MARITIME CASE STUDY – NEW DEEP WATER QUAY](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/A-V-Dawson-077-510x382.jpg)
![RAIL CASE STUDY – EDINBURGH TRAM NETWORK](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_5503-510x382.jpg)
![RAIL CASE STUDY – LONDON UNDERGROUND UPGRADE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/London-Underground-Chapel-Street-510x382.jpg)
![SPECIALIST CASE STUDY – FLOOD DEFENCE SUPPORT](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/4D-Eastney-1-510x382.jpg)
![SPECIALIST CASE STUDY – UNDERWATER PILE DRIVING](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Subsea7-02-cropped-510x382.jpg)
![HIGHWAY CASE STUDY – SLIP ROAD IMPROVEMENTS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC00956b-510x382.jpg)
![HIGHWAY CASE STUDY – MS3 & MS4 GANTRY FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/mSL271008b-510x382.jpg)
![SPECIALIST CASE STUDY – CONCRETE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_0798-cropped-510x382.jpg)
![BUILDING CASE STUDY – PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/SANY0111b-510x382.jpg)
![BUILDING CASE STUDY – BASEMENT EXTENSION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/IMG_1218b-510x382.jpg)
![RAIL CASE STUDY – WHITE HORSE BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DCP_0809-510x382.jpg)
![SPECIALIST CASE STUDY – OFFSHORE PIPELINE PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01999-510x382.jpg)
![BUILDING CASE STUDY – NEW BASEMENT](https://www.steelpilinggroup.org/wp-content/uploads/2017/12/hornsey-street-london-510x382.jpg)
![BUILDING CASE STUDY – AUTOMATED DISTRIBUTION CENTRE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/1-optimised.jpg)
![HIGHWAY CASE STUDY – WHADDON ROAD BRIDGE](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/PICTURE10-510x382.jpg)
![MARITIME CASE STUDY – RETAINING RIVERWALL](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/Pontoon-Work-1b-510x382.jpg)
![MARITIME CASE STUDY – THAMES PILE EXTRACTION](https://www.steelpilinggroup.org/wp-content/uploads/2018/01/DSC01734-510x382.jpg)
![HIGHWAYS CASE STUDY – BOX PILE BRIDGE FOUNDATIONS](https://www.steelpilinggroup.org/wp-content/uploads/2017/11/Box-Pile-Stratford-510x382.jpg)